The Program Executive Office (PEO) Aviation, Project Manager (PM) Future Long Range Assault Aircraft (FLRAA), on behalf of the Warfighter, seeks information on three distinct items:
(1) potential FLRAA physical prototype long lead materials list, costs, and timeline for ordering prior to initiation of prototype build;
(2) FLRAA development contract type for the Preliminary Design phase, the Detailed Design phase, and the Physical Prototype Build phase with rationale; and
(3) potential benefits, risks and assumptions for FLRAA notional development schedules. This information will inform PM FLRAA activities toward a potential FLRAA Program of Record (PoR).
The details are here – https://beta.sam.gov/opp/f1cc965fcb534878a962e061d05d2691/view
Industry inputs are due by May 26, 2020 04:00 pm CDT.